Life of an Architect World Headquarters – or LoaAWH (pronounced low-ah-wah-hhh) as I like to call it, is getting a small face lift.
I have been living in this house for over 4 years and this is the first semi-significant renovation I am taking on. I wrote previously ‘working on your own house sucks‘ and it’s still true but I can’t help but share some excitement about making my mark on my house (and I’m not talking about lifting my leg – grow up people.)
.
This is part of the area in question. See all those windows and the two doors? Yeah, well I wanted to replace them because they were built pretty badly and leaked air and … the list goes on. Also, see those four sections right in the middle? That would be plexiglas that the previous owner stuck up there and the way it was installed has led to the premature rotting of those 4×6 cedar beams (boooo.)
.
Here is a look up under the plexiglas – you can tell something architectural is going on here but this just didn’t work. I’m not a giant at 6′-1″ but I can’t walk under that 4×12 beam without hitting my head on it. You can also project that when you are inside the house looking out – guess what you see? The side of that beam … right in your face.
.
This is the interior of that room – also architecturally groovy. See all those brick pavers? Well, this area was originally designed as an outside space so those brick are dry set on the floor … so they move, clink, and clank when you walk on them. The floor also slopes…[sigh]. See all the exterior doors? That’s right, I said EXTERIOR doors that no longer go to the exterior. That double door on the left is into the Master Bedroom – there is a matching pair of double doors on the right that go into my daughters bedroom. Nothing like having glass doors basically from your kids room looking directly into your bedroom right? Maybe it worked out okay when she was 4 but now that she’s 8? Not so great.
Oh yeah, you have to step down about 4 1/2″ into this room from all the other rooms. [sigh]
.
One of the things I do love about this house is that it was set up and rigidly designed on a grid that carries throughout the entire house. The rooms are very well proportioned and the structure isn’t just holding stuff up, it’s part of the aesthetic of this house. While my wife might still be embarrassed to have people over, all of my architecture friends walk in and they get it instantly. There is a clarity to this house that is really nice.
.
Knowing that all the windows were going to be gone in a few days, we let my daughter go bananas writing on the glass with crayons. What kid (or adult) wouldn’t enjoy that?
.
I found this note written to “the windows” by my daughter and it totally cracked me up. My daughter even has compassion for glass.
“… Sorry you have to go to the dump.”
.
If you were to lie on the floor and look up, this is what you would see … wood tongue and groove cedar board ceiling, 4×6 cedar beams, and the Lamps of Lost Souls. Yes, those babies are not being reused so somebody please make me an offer … particularly if you work at a lighting company and have something awesome to trade.
.
This is a view from the main living area looking out towards the backyard – through the playroom. You can get a better look at the relationship of all the exterior doors have to the playroom. All of this is going away …
I did my design, prepared my drawings, got the permit, and work officially started Monday. This little project is small but complicated since this house is assigned as a Pandora’s box. You mess with one little thing, you have to deal with everything around it. Of course, I’m not making this easy since I want to do it right rather than cheap. The good news is that it will be quick. Take a look at this schedule:
.
Monday 10/15 – Demo, lumber and portable toilet delivered, and build temp walls Tuesday 10/16 – Demo, Install steel beam and frame roof Wednesday 10/17 – Concrete and shingle roof Thursday 10/18 – Concrete Friday 10/19 – Concrete Monday 10/22 – Door arrives (Hopefully), electrician, insulate wall and install sheathing Tuesday 10/23 – Door installation and start stucco Wednesday 10/24 – Glaze glass in door and stucco work continues Thursday 10/25 – Stucco work, remove temp wall, and clad trim work over the new door Friday 10/26 – Drywall installed HVAC chase Monday 10/29 – Painting Tuesday 10/30 – Painting Wednesday 10/31 – Painting Thursday 11/1 – Painting Friday 11/2 – Finish concrete floors Monday 11/5 – Finish concrete floors.
That my friends is called “getting on it.” I have a good friend who happens to be a very good contractor running this project. I could find some knucklehead contractor who would do this for less money but I want it done right the first time and by top-tier workers who actually care about the end product as much as they care about collecting a paycheck. I like my contractor types to have pride in what they do and that’s why I went with my friend Barry Buford at Buford Builders. If you are really observant you might realize that Barry is also the contractor for the Cottonwood Modern project.
A quick look at progress through two days of work:
.
Temporary walls are going in since we are removing exterior walls and we like mosquitos to remain outside and our air conditioning inside.
.
Remove the rotted 4×6 cedar beams, the concrete piers and the 16′ long 4×12 cedar beam that I hit my head on every time I tried to walk underneath it.
.
I had to get specially trained demolition guys in since the house was made with stucco back in the 1960’s. I live in University Park and they require certain measures be put in place when demolishing certain materials for fear of lead or asbestos (in my case, the fear was lead in the masonry stucco lath.) See how the guys are wearing respirators? They also have to wrap the masonry stucco up in heavy plastic rather than just tossing it in with all the other demotion materials.
.
This was the end of day one – nice clean shell. Demolition was complete, temporary walls in place, ready for tomorrow.
.
While I liked the architectural statement that the white masonry stucco piers made in the backyard, removing them really opened things up.
.
When I came home at lunch, this is what I found. They were installing the new steel header at the perimeter wall. This way I can get rid of the intermediate supports and really maximize my glass opening.
.
The man in the dark gray shirt is Gabe – he is the site superintendent on my project. He is unbelievably nice and despite the fact that he probably makes more than I do, he still calls me “sir.” Maybe it’s that he thinks I am soooo old that he’s just being polite. I’ve known Gabe for almost 7 years and he still calls me sir. That’s training, I’m sure his mother is very proud.
Since projects don’t normally start and finish in a one month window, I will be posting some frequent updates.One of the things we are doing on this project is refinishing the concrete floors in our house (yay and ugh.) There are a lot of moving parts to refinishing concrete floors so I will probably have a few posts just on that. Hopefully you won’t get sick of seeing how things develop.